Virginia DEQ
Home MenuMountain Valley Pipeline - Southgate Amendment
This page provides information on current activities related to Mountain Valley Pipeline's (MVP's) Southgate Amendment Project. The proposed project includes the construction of approximately 31.3 miles of 30-inch diameter pipeline; with 26.1 of those miles to be located in Pittsylvania County, Va. (The remaining 5.2 miles of pipeline would be located in Rockingham County, N.C.) The purpose of the pipeline is to transport natural gas from an interconnection point with the MVP Main Line project in Virginia to an interconnection point with the East Tennessee Natural Gas, LLC, system in N.C.
In Virginia, the construction of natural gas pipelines is regulated under several environmental programs.
- On Jan. 13, 2026, DEQ issued VWP Individual Permit No. 25-0752 for MVP's Southgate Amendment Project:
View the permit: MVP-SG_2026-01-13_Final VWP Individual Permit No. 25-0752
View the permit appendix: MVP-SG_2026-01-13_Final VWP Individual Permit No. 25-0752 - App. A_reduced size
Preconstruction Documentation - Streams & Wetlands
W-G002b
W-G001a
W-F002b
W-F002a
W-B050
W-B049
W-B043
W-B042b
W-B042a
W-B041
W-B039b
W-B038b
W-B038a
W-B037b
W-B036b
W-B036a
W-B035
W-B024
W-B023
W-B022
W-B021
W-B020
W-B019
W-B017
W-B016
W-B015
W-B014
W-B013b
W-B013a
W-A081
W-A079
W-A076
W-A073b
W-A073a
W-A073
W-A072
W-A071b
W-A070c
W-A070b
W-A070a
W-A069
W-A068
W-A063
W-A054
W-A051
W-A049b
W-A049a
W-A048
W-A047
W-A046
W-A045
W-A044
W-A043
W-A042
W-A041
W-A040
W-A039
W-A038
W-A037
W-A036
W-A035
W-A034
W-A033
W-A032
W-A031
W-A030b
W-A030a
W-A029b
W-A029a
W-A028
W-A027
W-A026
W-A025b
W-A025a
W-A024
W-A023
W-A022
W-A021
W-A020
W-A019
W-A017
W-A014a
W-A013d
W-A013b
W-A013a
W-A011
W-A010c
W-A010b
W-A010a
W-A009
W-A008
W-A007
W-A006
W-A005
W-A004
W-A003b
W-A003a
W-A001