The following is a list of owners with approved portable equipment forms. When a project is submitted for a pump station owned by an owner listed below, and the method of continuous operation is to use portable equipment, a portable equipment form will not need to be submitted for that project, as the owners below already have a master form approved until January 31, 2009.

The table below shows the capacity of the portable equipment and the response time. Be sure the overflow time from the pump station at peak flow to the station is greater than the response time to the station.

OwnerPump Capacity
(gpm)
Generator Capacity
(kW)
Response Time
(minutes)
City of Chesapeake140 to 1,60045 to 150110 to 170*
Chesapeake Schools25 to 100N/A30
Gloucester County200 to 1,850N/A25
Virginia Beach370 to 1,860125 to 15045
York County (E-One pump stations only) County maintained E-One pump stations

                       * Chesapeake has a chart with various response times.