Email: Don Brunson
Solid Waste Incinerator and Energy Recovery Facility Permit
Who Must Apply
Any owner or operator of incinerators and energy recovery facilities managing non-hazardous waste.
Authority
Virginia Code § 10.1-1408.1
Virginia Administrative Code 9 VAC 20-80-480 through 9 VAC 20-80-620
Term
Indefinite
Fees
Permit fees for all solid waste facilities are specified in 9 VAC 20-90-10 et seq.
Typical Requirements of a Permit
- Facilities must conform to siting, design and operation requirements in 9 VAC 20-80-470.
- Facilities must comply with the Financial Assurance Regulations for Solid Waste Facilities (9 VAC 20-70-10 et seq.).
Application Process
For Permit-by-Rule:
- Contact DEQ Regional Office for your location.
- Notify the Director of intent to operate such a facility and provide documentation required per 9 VAC 20-80-500.
- Provide certification that facility meets siting standards of 9 VAC 20-80-370.
- Provide certification from a Professional Engineer that facility has been designed and constructed in accordance with standards of 9 VAC 20-80-370.
- Submit operational plan and closure detailing how the standards of 9 VAC 20-80-340 and 9 VAC 20-80-370 will be met.
- Submit proof of financial responsibility in accordance with 9 VAC 20-70-10 et seq.
- Submit to the Director a copy of the facility permit issued by DEQ - Air Division.
For Full Permit:
Applicant may choose to apply for and receive a full permit. In this case, the appropriate notices, permit applications and fees shall be submitted in accordance with the provisions of 9 VAC 20-80-510 and 530.
