Online Services | Commonwealth Sites | Help | Governor

Virginia Department of Environmental Quality's logo

Email: Don Brunson

Solid Waste Landfill Permit

Who Must Apply

Any owner or operator of a sanitary landfill; construction, demolition and debris landfill; or an industrial landfill, public or private.

Authority

Subtitle D, RCRA

40 CFR Part 258 (for sanitary landfills)

Virginia Code § 10.1-1408.1

Virginia Administrative Code 9 VAC 20-80-480 through 9 VAC 20-80-620

Term

Indefinite

Fees

Permit fees for all solid waste facilities are specified in 9 VAC 20-90-10 et seq.

Typical Requirements of a Permit

  1. Public and private facilities must conform to siting, design, operation, ground water monitoring, closure and post-closure requirements in the 9 VAC 20-80-250, 260 or 270 as applicable.
  2. Facilities must comply with the Financial Assurance Regulations for Solid Waste Facilities (9 VAC 20-70-10 et seq.).

Application Process

  1. Contact the DEQ Regional Office for your location.
  2. Submit to DEQ the notice of intent to apply for a permit, accompanied by a certification from the local governing body that the proposed facility complies with all local ordinances. Also, must include a disclosure statement containing compliance histories of key personnel.
  3. Submit a siting study and a hydrologic study as required by the regulations. This is known as Part A of the application.
  4. Upon receipt of approval or conditional approval of Part A, submit the design, operational, ground water monitoring, closure and post-closure plans, which constitute Part B of the application.
  5. Submit appropriate permit application fee and, if applicable, financial assurance documents.

Templ:PROD-DEQTemplate_one | Editable:false | StartFldr:/waste/ | CurrentFilename:wastepermit6.html;