Project Number* | Project Name | Sponsoring Agency | Deadline for Comments to DEQ or Status | Project Contact |
|---|---|---|---|---|
| Pleasure House Point Land Acquisition | DOI/U.S. Fish and Wildlife Service | 02/29/12 | John Fisher | |
| Gamesa Energy GIIX Offshore Wind Turbine | DOD/U.S. Army Corps of Engineers | 02/29/12 | John Fisher | |
| Boar's Head Sports Club Squash Expansion | University of Virginia | 03/01/12 | Julia Wellman | |
| Facilities Management Landscape Shop | University of Virginia | 03/01/12 | Julia Wellman | |
| Route 1 Improvements at Fort Belvoir | USDOT/Federal Highway Administration | 02/29/12 | John Fisher | |
| I-95 Defense Access Roads Ramp to Fort Belvoir North Area | USDOT/Federal Highway Administration | 02/29/12 | John Fisher | |
| Rawley Square Tower | Virginia Department of State Police | 02/29/12 | Julia Wellman | |
| North Grounds Recreation Center Expansion | University of Virginia | 03/05/12 | Julia Wellman | |
| Install AWOS-III at Tangier Island Airport | Federal Aviation Administration | 02/29/12 | John Fisher | |
| Install AWOS-III at New Kent County Airport | Federal Aviation Administration | 02/29/12 | John Fisher | |
| Health and Wellness Center, College at Wise | University of Virginia | 02/24/12 | Julia Wellman | |
| New Education Welding Shop, Powhatan Correctional Center | Department of Correctional Education | 02/24/12 | Julia Wellman | |
| Airport Security Lightings | USDOT/FAA | 02/17/12 | John Fisher | |
| Rocketts Landing Collegiate Regatta | DHS/U.S. Coast Guard | 02/23/12 | Charlie Ellis | |
| Virginia State Police Tower -- Potts Mountain Road, Jefferson National Forest | Virginia Department of State Police | 02/16/12 | Julia Wellman | |
| Commercial Renewable Energy Transmission on the OCS Offshore Mid-Atlantic States | DOI/BOEM | 02/10/12 | John Fisher | |
| Air Field Clear Zone Management Plan, Naval Station Norfolk | DOD/Navy | 02/10/12 | John Fisher | |
| Virginia State Police Tower -- Dumfries Truck Weigh Station | Virginia Department of State Police | 02/08/12 | Julia Wellman | |
| Waxpool 230 kV/Brambleton-BECO 230 kV Transmission Lines, PUE-2011-00129 | State Corporation Commission | 02/08/12 | Julia Wellman | |
| Magnolia Gardens Apartment | Department of Housing and Urban Development | 02/01/12 | John Fisher | |
| Brookland Park Plaza | Department of Housing and Urban Development | 02/01/12 | John Fisher | |
| Roberts Road Assisted Living Facility | Department of Housing and Urban Development | 01/27/12 | John Fisher | |
| Mt. Weather Emergency Operations Center | DHS/FEMA | Completed (02/01/12) | Julia Wellman | |
| Swing-Space Building and Associated Infrastructure, George Bush Center for Intelligence | Central Intelligence Agency | 01/30/12 | Julia Wellman | |
| Camp Peary Bulkhead Repair and Removal | DOD/Navy | 01/30/12 | Julia Wellman | |
| Indoor Practice Facility -- Fieldhouse | University of Virginia | 01/20/12 | Julia Wellman | |
| Water Line Improvement | Department of Corrections | 01/20/12 | Julia Wellman | |
| North Wallops Island Unmanned Aerial Systems Airstrip | National Aeronautics and Space Administration | 01/18/12 | John Fisher | |
| Multidisciplinary Biomedical Research Center II, Hampton University | DHHS/National Institutes of Health | Completed (02/01/12) | Julia Wellman | |
| Navy Small Arms and Explosives Training Events on the M/V DEL MONTE | DHS/U.S. Coast Guard | Completed (01/19/12) | John Fisher | |
| New Entrance to Chopawamsic Backcountry Area | DOI/National Park Service | 01/20/12 | Julia Wellman | |
| Perimeter Security Improvements at Albert V. Bryan U.S. Courthouse | General Services Administration | Completed (01/31/12) | John Fisher | |
| Fire Management Plan at the Fredericksburg and Spotsylvania National Military Park | DOI/National Park Service | 01/10/12 | John Fisher | |
| Air Field Clear Zone Management Plan at Naval Air Station Oceana | DOD/U.S. Navy | Completed (02/02/12) | Julia Wellman | |
| Demolition of the Aircraft Landing Dynamics Facility Complex, Langley Research Center | National Aeronautics and Space Administration | Completed (01/18/12) | Julia Wellman | |
| Framework Adjustment 23 to the Atlantic Sea Scallop Fishery Management Plan | DOC/NOAA/National Marine Fisheries Service | Completed (01/31/12) | John Fisher | |
| Enhancement of Overnight Accommodations for the James River Ecology School at Presquile National Wildlife Refuge | DOI/U.S. Fish and Wildlife Service | Completed (01/25/12) | John Fisher | |
| 12th Street Commons | Virginia Commonwealth University | Withdrawn | John Fisher | |
| Community Solar Power Program and Certification of Proposed Distributed Solar Generation Facilities, Dominion Virginia Power | State Corporation Commission | Completed (02/02/12) | Julia Wellman | |
| Demolition and Installation of Transmitter Antennae | DHS/U.S. Coast Guard | Completed (01/25/12) | John Fisher | |
| Construction of Library, College at Wise | University of Virginia | Completed (01/20/12) | Julia Wellman | |
| Car Wash Facility, Fort Belvoir | DOD/Army Air Force Exchange Service | Completed (01/25/12) | John Fisher | |
| Secretarial Amendment to the Northeast Multispecies Fishery Management Plan | DOC/NOAA/National Marine Fisheries Service | Completed (01/09/12) | John Fisher | |
| Independent Spent Fuel Storage Installations | Nuclear Regulatory Commission | Completed (12/14/11) | John Fisher | |
| Level Ponds, Saxis Wildlife Management Area Expansion | U.S. Fish and Wildlife Service | Completed (11/21/11) | John Fisher | |
| Dahlgren 230 kV Transmission Line and Substation, Dominion, PUE-2011-00113 | State Corporation Commission | Completed (01/10/12) | Julia Wellman | |
| South Post Fire Station | Department of the Army, Fort Belvoir | Completed (12/20/11) | Julia Wellman | |
| Revise Permanent Safety Zone Regulations | U.S. Coast Guard | Completed (01/12/12) | John Fisher | |
| Colony Village Apartments | U.S. Department of Housing and Urban Development | Completed (12/20/11) | John Fisher | |
| Oceana Salvage Yard Access Road and Burial Unit | Department of the Navy | Completed (12/21/11) | John Fisher | |
| Solar Photovoltaic System | U.S. Department of Veterans Affairs | Completed (12/01/11) | Julia Wellman | |
| New Atlantic Community Health Center | U.S. Department of Health and Human Services/Health Resources and Services Administration | Completed (01/23/12) | John Fisher | |
John H. Kerr Dam and Reservoir Preliminary Final Master Plan and Programmatic Environmental Assessment | DOD/Army/U.S. Army Corps of Engineers | Completed (12/14/11) | Julia Wellman | |
| Quotas and Opening Dates for the 2012 Atlantic Shark Commercial Fishing Season | National Marine Fisheries Service | Completed (12/12/11) | John Fisher | |
| Force Structure Changes at Langley Air Force Base | DOD/U.S. Air Force | Completed (12/19/11) | John Fisher | |
| Comprehensive Annual Catch Limit Amendment | U.S. Department of Agriculture Rural Development | Completed (12/12/11) | John Fisher | |
| Heron’s Landing Apartments | U.S. Department of Agriculture Rural Development | Completed (11/23/11) | John Fisher | |
| Entrance Road and Visitor Parking Lot Resurfacing, Occoquan Bay National Wildlife Refuge | U.S. DOT/Federal Highway Administration | Completed (12/19/11) | John Fisher | |
| Duke Hall Renovation and Expansion | James Madison University | Completed (12/14/11) | Julia Wellman | |
| John and Sun Sanns Poultry House Construction | U.S. Department of Agriculture Farm Service Agency | Completed (12/12/11) | John Fisher | |
| Seabreeze Apartments Repairs and Shoreline Stabilization | U.S. Department of Agriculture Rural Development | Completed (12/12/11) | John Fisher | |
| Cricket Hill Apartments Renovation | U.S. Department of Agriculture Rural Development | Completed (12/12/11) | John Fisher | |
| Hanover Hall Alterations and Addition | George Mason University | Completed (12/06/11) | John Fisher | |
| Tappahannock-Essex County Airport Improvements | U.S. DOT/Federal Aviation Administration | Completed (01/10/12) | John Fisher | |
| Blue Ridge Parkway Draft General Management Plan | DOI/National Park Service | Completed (12/13/11) | Julia Wellman | |
| Streets of Greenbrier | Department of Housing and Urban Development | Completed (11/22/11) | John Fisher | |
| Demolition of Aircraft Landing Dynamics Facility | National Aeronautics and Space Administration | Completed (11/16/11) | John Fisher | |
| Post Hospital Renovation and Associated Construction | Virginia Military Institute | Completed (11/17/11) | Julia Wellman | |
| Amendment 18 to the Fishery Management Plan for Coast Migratory Pelagic Resources in the Gulf of Mexico and South Atlantic | National Marine Fisheries Service | Completed (11/16/11) | John Fisher | |
Quad II Residence Hall | Virginia State University | Completed (11/17/11) | Julia Wellman | |
| Stratton Park Phase 1 Sports Field | Department of Conservation and Recreation | Completed (11/16/11) | Julia Wellman | |
| Princess Anne Nursing Home | Department of Housing and Urban Development | Completed (11/15/11) | John Fisher | |
| Science Building Renovation and Construction | Virginia Military Institute | Completed (11/01/11) | Julia Wellman | |
| Revisions to Safety and Environmental Management Systems for Oil, Gas and Sulphur Operations in the Outer Continental Shelf | DOI/Bureau of Ocean Energy Management, Regulation and Enforcement | Completed (11/10/11) | John Fisher | |
| Force Structure Changes at Langley Air Force Base | DOD/U.S. Air Force | Completed (10/12/11) | John Fisher | |
| Fort Belvoir Waterline Upgrades | DOD/U.S. Army | Completed (11/02/11) | John Fisher | |
| Airfield Clear Zone Management Plan, Naval Auxiliary Landing Field Fentress | DOD/Navy | Completed (11/01/11) | John Fisher | |
| Neptune Festival Fireworks | DHS/U.S. Coast Guard | Completed (09/22/11) | John Fisher | |
| Poquoson Seafood Festival Boat Race | DHS/U.S. Coast Guard | Completed (09/21/11) | John Fisher | |
| Fort Hunt Park Site Development Plan, George Washington Memorial Parkway | DOI/National Park Service | Completed (10/31/11) | Julia Wellman | |
Undeveloped Lot, Clydesway Road, New Bureau of Criminal Investigation | Department of State Police | Completed (10/20/11) | Julia Wellman | |
Hiden-Hussey Commons Expansion | Christopher Newport University | Completed (10/18/11) | Julia Wellman | |
Electrical and Operational Upgrade, Space Addition and GOES Satellite Installation, Wallops Command and Data Acquisition Station | National Oceanic and Atmospheric Administration | Completed (10/20/11) | Julia Wellman | |
Launch of NASA Routine Payloads on Expendable Launch Vehicles | National Aeronautics and Space Administration | Completed (10/06/11) | Julia Wellman | |
| Heritage Forest Phase II | U.S. Department of Housing and Urban Development | Completed (10/11/11) | John Fisher | |
| Atlantic Mackerel, Squid, and Butterfish Fishery Management Plan | DOC/NOAA/National Marine Fisheries Service | Completed (10/11/11) | John Fisher | |
| Marine Animal Care Center | DOD/U.S. Navy | Completed (09/29/11) | John Fisher | |
| Construction and Operation of a U.S. Army Reserve Center | DOD/U.S. Army | Completed (09/01/11) | Julia Wellman | |
| New Fraternity Housing-Sites 3 and 8 | College of William and Mary | Completed (10/04/11) | Julia Wellman | |
| Roanoke Valley/Blue Ridge Parkway Trail Plan | DOI/National Park Service | Completed (09/08/11) | Julia Wellman | |
| Parking Garage | VCCS/Germanna Community College | Completed (10/03/11) | Julia Wellman | |
| Northwest-Lakeside 230 Transmission Line | State Corporation Commission | Completed (10/05/11) | Julia Wellman | |
| Naval Special Warfare Development Group 900-yard Firing Platform, Naval Air Station Annex, Dam Neck | DOD/U.S. Navy | Completed (09/26/11) | Julia Wellman | |
| Cove Point Re-Export Project | Federal Energy Regulatory Commission | Completed (10/05/11) | John Fisher | |
| Flannagan Hydroelectric Project | Federal Energy Regulatory Commission | Completed (08/25/11) | Julia Wellman | |
| Install Transformer at York River Pier, Coast Guard Training Center Yorktown | DHS/U.S. Coast Guard | Completed (09/26/11) | John Fisher | |
| Expansion of Range Instruction Building, Coast Guard Training Center Yorktown | DHS/U.S. Coast Guard | Completed (09/26/11) | John Fisher | |
| Chesapeake Bay Workboat Race | DHS/U.S. Coast Guard | Completed (09/06/11) | John Fisher | |
| Airfield Upgrades and Repairs at Naval Auxiliary Landing Field Fentress | DOD/U.S. Navy | Completed (09/15/11) | John Fisher | |
| Renovation of AutoHobby Lift Station | DHS/U.S. Coast Guard | Completed (09/08/11) | John Fisher | |
| 2010 Master Plan for the Defense Supply Center Richmond | DOD/Defense Logistics Agency | Completed (09/15/11) | Julia Wellman | |
| Shoreline Stabilization and Restoration at Naval Support Facility Dahlgren | DOD/Navy | Completed (09/06/11) | John Fisher | |
| Major Unit Modification of the Hopewell Power Station | State Corporation Commission | Completed (09/21/11) | John Fisher | |
| Southampton Power Station Conversion | State Corporation Commission | Completed (09/28/11) | Julia Wellman | |
| Altavista Power Station Conversion | State Corporation Commission | Completed (09/14/11) | Julia Wellman | |
| Stars and Stripes Spectacular | U.S. Coast Guard | Completed (07/18/11) | John Fisher | |
| Commercial Wind Lease Issuance and Site Characterization Activities on the Atlantic Outer Continental Shelf Offshore New Jersey, Delaware, Maryland, and Virginia | DOI/Bureau of Ocean Energy Management, Regulation and Enforcement | Completed (08/09/11) | John Fisher | |
| Fisher House | DOD/Army | Completed (09/31/11) | John Fisher | |
| Virginia Chesapeake Bay Artificial Reefs | Virginia Marine Resources Commission | Completed (07/27/11) | John Fisher | |
Medical Center Outpatient Surgery Center Addition | UVA | Completed (08/18/11) | Julia Wellman | |
Master Plan Parking Lots Revision | CNU | Completed (07/20/11) | Julia Wellman | |
Woodlawn Road, Jackson Loop Phase 1 and DeWitt Hospital Phase I Waterline Replacements | DOD/Army | Completed (08/17/11) | John Fisher | |
Labor Day Fireworks Show | DHS/USCG | Completed (07/28/11) | John Fisher | |
Hotel and Conference Center at Marine Corps Heritage Center, Quantico | DOD/Marines | Completed (08/17/11) | John Fisher | |
Tylers Beach Federal Navigation Project | DOD/Army Corps | Completed (08/17/11) | John Fisher | |
Replace Sewage Piping Beneath North and South Piers, USCG Base Support Unit Portsmouth | DHS/USCG | Completed (08/15/11) | John Fisher | |
Rule to Adjust the 2011 North and South Atlantic Swordfish Quotas | DOC/NOAA/NMFS | Completed (08/01/11) | John Fisher | |
Upper Level Student Housing | George Mason University | Completed (08/18/11) | Julia Wellman | |
| Life Sciences Lab Building and Parking Lot | George Mason University | Completed (08/16/11) | Julia Wellman | |
| Isle of Wight 4th of July Fireworks Show | DHS/U.S. Coast Guard | Completed (06/27/11) | John Fisher | |
| Airport Entrance Sign at Chesapeake Regional Airport | USDOT/Federal Aviation Administration | Completed (08/09/11) | John Fisher | |
| Tangier Wind Turbine | USDOT/Federal Aviation Administration | Completed (08/11/11) | John Fisher | |
| Rehabilitation of Pohick Creek Watershed Dam No. 8 | USDA/Natural Resources Conservation Service | Completed (07/14/11) | John Fisher | |
| Mattaponi Drag Boat Race | DHS/U.S. Coast Guard | Completed (08/01/11) | John Fisher | |
| Qualifications Training Range at Fort Lee | DOD/U.S. Army | Completed (08/10/11) | John Fisher | |
| Student Success Center | Christopher Newport University | Completed (08/08/11) | Julia Wellman | |
| Land and Resource Management Plan | USDA/Forest Service | Completed (10/17/11) | Julia Wellman | |
| South Institute Hill Parking Lot | Virginia Military Institute | Completed (08/01/11) | Julia Wellman | |
| Range 14 Improvements | DOD/U.S. Marine Corps | Completed (08/02/11) | Julia Wellman | |
| College of Veterinary Medicine Instruction Addition | Virginia Tech | Completed (07/21/11) | Julia Wellman | |
| Dominion Boulevard Roadway and Bridge Improvements | USDOT/Federal Highway Administration | Completed (08/08/11) | John Fisher | |
| Second Modification to the York River Pier Repair Project | DHS/U.S. Coast Guard | Completed (07/25/11) | John Fisher | |
| Nantucket Lightship Access Area | DOC/NOAA/National Marine Fisheries Service | Completed (07/18/11) | John Fisher | |
| Atlantic Herring Fishery Management Plan | DOC/NOAA/National Marine Fisheries Service | Completed (07/18/11) | John Fisher | |
| Amendment 3 to the Atlantic Deep-Sea Red Crab Fishery Management Plan | DOC/NOAA/National Marine Fisheries Service | Completed (07/18/11) | John Fisher | |
| The Landmark at Talbot | Department of Housing and Urban Development | Completed (07/21/11) | John Fisher | |
| Warren County Power Station, Front Royal Switching Station, and Associated Transmission Lines | State Corporation Commission | Completed (08/10/11) | Julia Wellman | |
| EA and Integrated Cultural Resources Management Plan | DOD/U.S. Army | Completed (07/27/11) | Julia Wellman | |
| Installation of Sandbags at Existing Dune Slope, Dam Neck Annex | DOD/U.S. Navy | Completed (07/12/11) | Julia Wellman | |
| Dooms-Bremo 230 kV Transmission Line Rebuild | State Corporation Commission | Completed (07/14/11) | Julia Wellman | |
Gateway II Residence Hall | Virginia State University | Completed (07/14/11) | Julia Wellman | |
| Wytheville AHQ Chemical Storage Building | Virginia Department of Transportation | Completed (07/07/11) | Julia Wellman | |
| Parade Grounds Areas Water Upgrades, Fort Belvoir | DOD/Army/Fort Belvoir | Completed (07/07/11) | John Fisher | |
| Temporary Emergency Action to Increase the 2011 Butterfish Quota | DOC/NOAA/NMFS | Completed (06/27/11) | John Fisher | |
| Checed Creek Apartments | HUD | Completed (07/12/11) | John Fisher | |
| Temporary Installation of an Administrative Pier at Joint Expeditionary Base Little Creek | DOD/U.S. Navy | Withdrawn by applicant | John Fisher | |
| Grace and Shafer Multi-Family Apartment | Department of Housing and Urban Development | Completed (06/27/11) | John Fisher | |
| Pentagon Sentry Program | Department of Defense | Completed (06/01/11) | John Fisher | |
| Naval Special Warfare Development Group 400-Yard Firing Line | DOD/U.S. Navy | Completed (06/27/11) | John Fisher | |
Mid-Atlantic Connector Expansion Project | Federal Energy Regulatory Commission | Completed (05/26/11) | Julia Wellman | |
Abingdon AHQ Chemical Storage Building | Virginia Department of Transportation | Completed (06/27/11) | Julia Wellman | |
Glamorgan AHQ Chemical Storage Building | Virginia Department of Transportation | Completed (06/27/11) | Julia Wellman | |
Grounds Maintenance Facility | Christopher Newport University | Completed (06/29/11) | Julia Wellman | |
Chincoteague Fire Company Wild Pony Swim | DHS/U.S. Coast Guard | Completed (06/14/11) | John Fisher | |
McCormick Road Walls | University of Virginia | Completed (06/27/11) | Julia Wellman | |
Range Station 21 Shoreline Stabilization | DOD/Navy | Completed (06/27/11) | John Fisher | |
Asymmetric Warfare Group 800- and 1,200-Meter Training Ranges | DOD/Army/Fort A.P. Hill | Completed (06/16/11) | Julia Welmlan | |
Atlantic Shark Management Measures | DOC/NOAA/NMFS | Completed (06/14/11) | John Fisher | |
Marine Event Permit: Waterman's Heritage Festival Boat Race | DHS/U.S. Coast Guard | Completed (06/01/11) | John Fisher | |
| West Grace Street Housing – North Acquisition and Construction | Virginia Commonwealth University | Completed (06/15/11) | Julia Wellman | |
| Swine Research Building 450, Modular Addition | Virginia Tech | Completed (06/14/11) | Julia Wellman | |
| Wormley Creek Pier Extension | DHS/U.S. Coast Guard | Completed (07/05/11) | John Fisher | |
| Van Dorn AHQ Chemical Storage Building | Virginia Department of Transportation | Completed (06/02/11) | John Fisher | |
| Centennial of Naval Aviation Air Show | DHS/U.S. Coast Guard | Completed (06/01/11) | John Fisher | |
| New Fitness and Wellness Center | Radford University | Completed (05/26/11) | Julia Wellman | |
| Center for Sciences | Radford University | Completed (05/25/11) | Julia Wellman | |
| Regional Conditions for Corps Nationwide Permits | DOD/U.S. Army Corps of Engineers | Completed (04/13/11) | John Fisher | |
| Air Power Over Hampton Roads Air Show | DHS/U.S. Coast Guard | Completed (06/01/11) | John Fisher | |
| 85th Hampton Cup Regatta | DHS/U.S. Coast Guard | Completed (05/25/11) | John Fisher | |
| Shore Thing and Independence Day Fireworks Show | DHS/U.S. Coast Guard | Completed (05/23/11) | John Fisher | |
| Dominion Radnor Heights Substation and Transmission Line | DOD/U.S. Army | Completed (05/25/11) | John Fisher | |
| Wicomico Community Fireworks Show | DHS/U.S. Coast Guard | Completed (05/25/11) | John Fisher | |
| North Campus Steam Extension | Virginia Tech | Completed (05/31/11) | Julia Wellman | |
| Rappahannock River Boaters Association Radar Shootout | DHS/U.S. Coast Guard | Completed (05/23/11) | John Fisher | |
| School of Engineering and Applied Sciences Student Projects and Facilities Management Shop Building, and Edgemont Road Utility Extensions | University of Virginia | Completed (05/24/11) | Julia Wellman | |
| 24th Annual Cock Island Race | DHS/U.S. Coast Guard | Completed (05/23/11) | John Fisher | |
| Natural Resource Plan and Programmatic Environmental Impact Statement | Tennessee Valley Authority | Completed (05/06/11) | Julia Wellman | |
| Future Mission Requirements at Maneuver Training Center, Fort Pickett | Virginia Department of Military Affairs | Completed (05/26/11) | Julia Wellman | |
| Modification to the York River Pier Repair Project | DHS/U.S. Coast Guard | Completed (04/14/11) | John Fisher | |
| The Spectrum at Willoughby Point | U.S. Department of Housing and Urban Development | Completed (05/18/11) | John Fisher | |
| Demolition of Building C at Lafayette River Annex | DOD/U.S. Navy | Completed (05/17/11) | John Fisher | |
Final EA and Draft FONSI, Wallops Flight Facility Alternative Energy Project | National Aeronautics and Space Administration | Completed (04/20/11) | Julia Wellman | |
Hampton Blackbeard Festival | U.S. Coast Guard | Completed (05/02/11) | John Fisher | |
Amherst Chemical Storage Building | Virginia Department of Transportation | Completed (05/18/11) | Julia Wellman | |
Keysville Interchange Chemical Storage Building | Virginia Department of Transportation | Completed (05/18/11) | Julia Wellman | |
Mooring Upgrades to Pier 1, Naval Station Norfolk | DOD/Department of the Navy | Completed (05/04/11) | Julia Wellman | |
Student Center, Tidewater Community College | Virginia Community College System | Completed (05/05/11) | Julia Wellman | |
35th Annual Norfolk Harborfest | U.S. Coast Guard | Completed (04/28/11) | John Fisher | |
Construction of Parking Lots at the New Town Project | National Aeronautics and Space Administration | Completed (05/16/11) | John Fisher | |
Rule to Modify the Retention of Incidentally-Caught Highly Migratory Species in Atlantic Trawl Fisheries | National Marine Fisheries Service | Completed (04/28/11) | John Fisher | |
Virginia State Hydroplane Championship | U.S. Coast Guard | Completed (04/12/11) | John Fisher | |
| Hollymead 230 kV Double Circuit Transmission Line | State Corporation Commission | Completed (05/16/11) | Julia Wellman | |
| Atlantic Bluefin Tuna Quotas and Atlantic Tuna Fisheries Management Measures | National Marine Fisheries Service | Completed (04/28/11) | John Fisher | |
| Reissuance and Modification of Nationwide Permits | DOD/U.S. Army Corps of Engineers | Completed (04/13/11) | John Fisher | |
| Norfolk and Portsmouth Belt Line Rail Yard Reconstruction Part II EIR | Virginia Port Authority | Completed (05/05/11) | Julia Wellman | |
| Cape Charles Fireworks Safety Zone | DHS/U.S. Coast Guard | Completed (04/14/11) | John Fisher | |
| Danville Science Center Addition | Virginia Science Museum | Completed (05/04/11) | Julia Wellman | |
| Newport News Marine Terminal | Virginia Port Authority | Completed (05/03/11) | Julia Wellman | |
| Naval Health Clinic Upgrade at Naval Support Facility Dahlgren | DOD/U.S. Navy | Completed (05/03/11) | John Fisher | |
Reconfiguration of the Wallops Flight Facility Main Entrance | NASA | Completed (05/02/11) | John Fisher | |
Wild Duck Lane Property Acquisition | Virginia Port Authority | Completed (05/03/11) | Julia Wellman | |
Gathright Hydroelectric Project, Jackson River | Federal Energy Regulatory Commission | Completed (03/23/11) | Julia Wellman | |
Children's Hospital of Richmond Pavilion | Virginia Commonwealth University | Completed (04/27/11) | John Fisher | |
Lebanon Village II Apartments | USDA/Rural Development | Completed (04/11/11) | John Fisher | |
Spiny Dogfish FMP Including 2011 Specifications | National Marine Fisheries Service | Completed (04/06/11) | John Fisher | |
Temporary Emergency Action to Increase the 2011 Butterfish Quota | National Marine Fisheries Service | Completed (04/06/11) | John Fisher | |
Cannon Branch-Cloverhill 230 kV Transmission Line and Cloverhill Substation | State Corporation Commission | Completed (04/26/11) | Julia Wellman | |
Master Plan Parking Lots | Christopher Newport University | Completed (04/19/11) | Julia Wellman | |
| Virgnia Commonwealth University Rocketts Landing Sprint Regatta | DHS/U.S. Coast Guard | Completed (03/15/11) | John Fisher | |
| Implementation of the Privatization of the Army Lodging Program at Fort Belvoir | DOD/U.S. Army Corps of Engineers | Completed (04/04/11) | John Fisher | |
| Track and Field Improvements | University of Virginia | Completed (04/14/11) | Julia Wellman | |
| Blandy Experimental Farm Field Lab Relocation | University of Virginia | Completed (03/24/11) | Julia Wellman | |
| Kentland Farm Dairy Relocation | Virginia Tech | Completed (04/12/11) | Julia Wellman | |
| Occoneechee State Park Marina at John H. Kerr Reservoir | DOD/U.S. Army Corps of Engineers | Completed (03/14/11) | Julia Wellman | |
| Steam Plants Improvements | Department of Corrections | Completed (04/08/11) | Julia Wellman | |
| Virgnia Commonwealth University Rocketts Landing Collegiate Regatta | DHS/U.S. Coast Guard | Completed (03/14/11) | John Fisher | |
| Mt. Storm-Doubs 500 kV Transmission Line Rebuild | State Corporation Commission | Completed (04/04/11) | Julia Wellman | |
| Transmitter Antenna Replacement at USCG CAMSLANT | DHS/U.S. Coast Guard | Completed (03/29/11) | John Fisher | |
| Amendment 15 and Framework 22 to the Atlantic Sea Scallop Fishery Management Plan | DOC/NOAA/NMFS | Completed (03/17/11) | John Fisher | |
| Marine Corps Security Force Regiment Consolidation, Naval Weapons Station Yorktown | DOD/Navy | Completed (03/23/11) | John Fisher | |
| Shoreline Stabilization at John H. Kerr Reservoir | DOD/U.S. Army Corps of Engineers | Completed (02/14/11) | Julia Wellman | |
| Hog Island West Shoreline Stabilization Project | Department of Game and Inland Fisheries | Completed (03/17/11) | John Fisher | |
| York River Peir Repair at USCG Training Center Yorktown | DHS/U.S. Coast Guard | Completed (02/23/11) | John Fisher | |
East Chiller Plant | University of Virginia | Completed (03/16/11) | Julia Wellman | |
| Repairs to Existing Riprap Stabilization Structure at Piers A & C, Craney Island | Department of the Navy | Completed (03/09/11) | Julia Wellman | |
| WMATA Eisenhower Avenue Metro Station Improvements | Washington Metropolitan Area Transit Authority | Completed (03/10/11) | John Fisher | |
| Amendment 11 to the Atlantic Mackerel, Squid, and Butterfish (MSB) Fishery Management Plan (FMP) | National Marine Fisheries Service | Completed (02/24/11) | John Fisher | |
VCU Institute for Contemporary Art | Virginia Commonwealth University | Completed (03/02/11) | John Fisher | |
| Metro Transit Police Department District II Substation and Training Facility | Washington Metropolitan Area Transit Authority | Completed (03/10/11) | John Fisher | |
| Possum Point-Pepco Interconnection 500 kV Transmission Line, PUE 2010-00148 | State Corporation Commission | Completed (03/08/11) | Julia Wellman | |
| Higher Education Center, Northern Virginia Community College | Virginia Community College System | Completed (02/23/11) | Julia Wellman | |
| Replacement and Operation of the Central Plant Turbine Generators at the CIA | Central Intelligence Agency | Completed (02/16/11) | John Fisher | |
| Elizabeth Hartwell Mason Neck and Featherstone National Wildlife Refuges | DOI/U.S. Fish and Wildlife Service | Completed (02/17/11) | Julia Wellman | |
| Correct Drainage Problems at U.S. Coast Guard CAMSLANT Chesapeake | DHS/U.S. Coast Guard | Completed (03/01/11) | John Fisher | |
| Nationwide Use of HF and UHF Active Sonar Technology | DHS/U.S. Coast Guard | Completed (01/27/11) | Julia Wellman | |
| Managing Waterfowl Damage in the Commonwealth of Virginia | USDA/APHS | Completed (02/28/11) | John Fisher | |
| Runways 4-22 and 15-33 Runway Safety Area Enhancements, Ronald Reagan Washington Airport | Federal Aviation Administration | Completed (01/19/11) | John Fisher | |
| Directorate of Family and Morale, Welfare and Recreation Travel Camp | DOD/Army/Fort Belvoir | Completed (02/03/11) | John Fisher | |
| Point-of-View, ICAR Center | George Mason University | Completed (02/15/11) | John Fisher | |
| Campus Bookstore, Central Virginia Community College | Virginia Community College System | Completed (02/07/11) | Julia Wellman | |
| Blandy Experimental Farm Field | University of Virginia at Wise | Completed (02/03/11) | Julia Wellman | |
| Resident Hall V | Christopher Newport University | Completed (02/03/11) | Julia Wellman | |
| Runways 4-22 and 15-23 Runway Safety Area Enhancements, Ronald Reagan Washington National Airport | Federal Aviation Administration | Completed (01/19/11) | John Fisher | |
| Regional Permit 5 for the Construction of Small Impoundments | DOD/U.S. Army Corps of Engineers | Completed (04/14/11) | John Fisher | |
| Omnibus Amendment to Six Fishery Management Plans | DOC/NOAA/National Marine Fisheries Service | Completed (01/20/11) | John Fisher | |
| Thrust Theater Addition | University of Virginia | Completed (01/25/11) | John Fisher | |
| Phase IV Oak Lane Community | Virginia Tech | Completed (01/20/11) | Julia Wellman | |
| Stadium Walk | University of Virginia at Wise | Completed (01/25/11) | Julia Wellman | |
| Mason Creek Canal Bulkhead Replacement at Naval Station Norfolk | DOD/U.S. Navy | Completed (01/24/11) | John Fisher | |
| Student Health and Sciences Center, New Entry Plaza | James Madison University | Completed (01/24/11) | Julia Wellman | |
| Combined License and U.S. Army Corps of Engineers Permit for the North Anna Power Station Unit 3 | Nuclear Regulatory Commission | Completed (05/16/11) | John Fisher | |
| VTES Ductbank from Lane Substation to the NW Quadrant of Campus | Virginia Tech | Completed (01/13/11) | Julia Wellman | |
| Mid-Atlantic Connector Expansion by Transcontinental Gas Pipeline Company, LLC | Federal Energy Regulatory Commission | Completed (01/31/11) | John Fisher | |
| South Boston Energy LLC, 49.9 MW Biomass Electric Generating Facility | State Corporation Commission | Completed (01/11/11) | Julia Wellman | |
| Riverview Lofts | U.S. Department of Housing and Urban Development | Completed (01/10/11) | John Fisher | |
| Environmental Assessment, South Boston Energy Project | USDA/Rural Utilities Service | Completed (12/06/10) | Julia Wellman | |
| Extension of Sewer System, Renovation of Foster Falls Hotel, New River Trail State Park | Department of Conservation and Recreation | Completed (12/16/10) | Julia Wellman | |
| Austinville Limestone Company, Inc., Tract Acquisition | Department of Conservation and Recreation | Completed (12/16/10) | Julia Wellman | |
| Expansion and Modernization of the Navy Morale, Welfare and Recreation Marina Joint Expeditionary Base Little Creek | DOD/Navy | Completed (12/16/10) | Julia Wellman | |
| Replacement and Operation of the Central Plant Turbine Generators at the CIA | CIA | Completed (11/18/10) | John Fisher | |
| National Museum of the U.S. Army, Fort Belvoir | DOD/Army | Completed (12/16/10) | John Fisher | |
| Wallops Flight Facility Shorelines Restoration and Infrastructure Protection Program | NASA | Completed (11/29/10) | John Fisher | |
| 2011 Atlantic Mackerel, Squid and Butterfish Specifications and Management Measures | DOC/NOAA/NMFS | Completed (12/09/10) | John Fisher | |
| Madison AHQ Chemical Storage Building | Virginia Department of Transportation | Completed (12/15/10) | Julia Wellman | |
| New Science Building | Christopher Newport University | Completed (12/13/10) | John Fisher | |
| Listing Determinations for 3 Distinct Population Segments of Atlantic Sturgeon in the Northeast Region | DOC/NOAA/National Marine Fisheries Service | Completed (11/18/10) | John Fisher | |
| AST Rehabilitation at U.S. Coast Guard Station Little Creek | DHS/U.S. Coast Guard | Completed (12/09/10) | John Fisher | |
| Boat Ramp Maintenance Dredging at Naval Support Facility Dahlgren | DOD/U.S. Navy | Completed (12/02/10) | John Fisher | |
| Monkfish Fishery Management Plan Including Amendment 5 | DOC/NOAA/National Marine Fisheries Service | Completed (11/18/10) | John Fisher | |
| Newcomb Hall Dining Expansion | University of Virginia | Completed (11/30/10) | John Fisher | |
| Runway 10/28 Obstruction Removal at Hampton Roads Executive Airport | U.S. DOT/Federal Aviation Administration | Completed (11/10/10) | John Fisher | |
| PATH 765 kV Transmission Line | State Corporation Commission | Completed (12/14/10) | Julia Wellman | |
| Thornburg Chemical Storage Building | Department of Transportation | Completed (11/29/10) | Julia Wellman | |
| Atlantic Highly Migratory Species: Atlantic Billfish Management, White Marlin and Roundscale Spearfish | DOC/NOAA/National Marine Fisheries Service | Completed (11/02/10) | John Fisher | |
| Marion Correctional Treatment Center – Inmate Dormitory | Department of Corrections | Completed (11/18/10) | Julia Wellman | |
| Proposed New Student Recreation Center | VCCS Blue Ridge Community College | Completed (11/18/10) | Julia Wellman | |
| Captain John Smith Chesapeake National Historic Trail | DOI/National Park Service | Completed (11/04/10) | John Fisher | |
| Fork Union Fire Station | Federal Emergency Management Agency | Completed (10/26/10) | Julia Wellman | |
| Renovation of Fields A & D and Stormwater Facility Construction | University of Mary Washington | Completed (11/18/10) | Julia Wellman | |
| Programmatic Draft EIS for the Integrated Resource Plan | Tennessee Valley Authority | Completed (11/01/10) | Julia Wellman | |
| Dormitories, Dining Hall and Commons Area, Smithsonian Conservation Biology Institute | George Mason University | Completed (11/17/10) | Julia Wellman | |
| Rule to Establish Quotas for 2011 Commercial Fishing Season and Adaptive Management for the Atlantic Shark Fishery | DOC/NOAA/National Marine Fisheries Service | Completed (10/22/10) | John Fisher | |
| Wastewater Treatment Facility at Point-of-View Campus | George Mason University | Completed (06/14/11) | John Fisher | |
| Permanent and Temporary Changes to Drawbridge Operating Schedules | U.S. DHS/U.S. Coast Guard | Completed (10/20/10) | John Fisher | |
| Lake Barton Dam Spillway Improvement Project | USDA/Natural Resources Conservation Service | Completed (11/02/10) | Julia Wellman | |
| Patrick Henry Place Apartments | U.S. Department of Housing and Urban Development | Completed (10/14/10) | John Fisher | |
| Installation of Nine Pilings and One Floating Pier, Owl’s Creek Annex | DOD/U.S. Navy | Completed (10/06/10) | Julia Wellman | |
| New Hydropower License, Claytor Project | Federal Energy Regulatory Commission | Completed (09/08/10) | Julia Wellman | |
| Cove Project, J.H. Kerr Reservoir | DOD/U.S. Army Corps of Engineers | Completed (09/09/10) | Julia Wellman | |
| Alderman Road Housing – Phase IV | University of Virginia | Completed (10/04/10) | Julia Wellman | |
| New Commissary, Exchange and Future Mixed Use Development at Fort Belvoir | DOD/U.S. Army and Air Force | Completed (09/16/10) | John Fisher | |
| Chiller #3 at South Chiller Plant and Emergency Generator Site | University of Virginia | Completed (10/04/10) | Julia Wellman | |
| Dismal Swamp Canal Trail Improvements | USDOT/Federal Highway Administration | Completed (09/01/10) | John Fisher | |
| Waste Water Treatment Plant Replacement at U.S. Coast Guard Station Milford Haven | DHS/U.S. Coast Guard | Completed (01/10/11) | John Fisher | |
| Rule to Amend Turtle Excluder Devices in the Shrimp and Summer Flounder Trawl Fisheries | DOC/NOAA/National Marine Fisheries Service | Completed (09/16/10) | John Fisher | |
| Construction and Operation of a U.S. Army Reserve Center at Fort A.P. Hill | DOD/U.S. Navy | Completed (09/23/10) | Julia Wellman | |
| Support Services Building at the Northern Virginia Community College Woodbridge Campus | Virginia Community College System | Completed (09/20/10) | John Fisher | |
| National Institute of Aerospace Facility | Virginia Tech | Completed (09/16/10) | Julia Wellman | |
| Alexan Dunn Loring | U.S. Department of Housing and Urban Development | Completed (09/13/10) | John Fisher | |
| Northeastern Tennessee Project | Federal Energy Regulatory Commission | Completed (08/25/10) | Julia Wellman | |
| Cephas C&D Wastes Biomass Project, Virginia State Energy Program | U.S. Department of Energy | Completed (08/09/10) | Julia Wellman | |
| Draft Supplemental Watershed Plan for the South River Watershed | U.S. Department of Agriculture | Completed (08/26/10) | Julia Wellman | |
| Amendment 4 to the Atlantic Herring Fishery Management Plan | DOC/NOAA/National Marine Fisheries Service | Completed (08/31/10) | John Fisher | |
| River Rescue North Boathouse Relocation, Ronald Reagan Washington National Airport | FAA/MWAA | Completed (08/30/10) | John Fisher | |
| Construct Clear Span Hanger, Apron, Parking Lot and Access Road at Middle Peninsula Regional Airport | Federal Aviation Administration | Completed (10/04/10) | John Fisher | |
| Acquisition of Rockingham Cooperative Farm Bureau, Parcels A and B | James Madison University | Completed (08/26/10) | Julia Wellman | |
| Third Floor Fit-Out, Injection Suite and Emergency Generator | University of Virginia | Completed (08/13/10) | Julia Wellman | |
| Cyclotron Facility, School of Medicine, Radiology Department | University of Virginia | Completed (08/11/10) | Julia Wellman | |
| Gate Improvements at Norfolk International Terminals-South | Virginia Port Authority | Completed (08/12/10) | John Fisher | |
| Chambers Field Improvements, Naval Station Norfolk | DOD/U.S. Navy | Completed (08/17/10) | Julia Wellman | |
| Rule to Adjust the 2010 North and South Atlantic Swordfish Quotas | DOC/NOAA/National Marine Fisheries Service | Completed (08/09/10) | John Fisher | |
| Van Metre at Kensington Place | U.S. Department of Housing and Urban Development | Completed (08/09/10) | John Fisher | |
| Calvert Cliffs Nuclear Power Plant (Maryland) Unit 3 Combined License | U.S. Nuclear Regulatory Commission | Completed (07/07/10) | John Fisher | |
| Installation of New Bulkhead and Demolition of Existing Wharf Structure | DOD/U.S. Navy | Completed (07/21/10) | John Fisher | |
| Spillway Construction at Brittle Dam | Department of Game and Inland Fisheries | Completed (07/29/10) | Julia Wellman | |
| SLN 5100 Apartments | U.S. Department of Housing and Urban Development | Completed (07/28/10) | John Fisher | |
| Nelson Dam Spillway Construction | Department of Game and Inland Fisheries | Completed (07/29/10) | Julia Wellman | |
| Pavilion IX Renovation and Utility Re-Routing | University of Virginia | Completed (07/27/10) | Julia Wellman | |
| Acquisition of 28 W. Grace Street and 781 Walnut Lane | James Madison University | Completed (07/26/10) | Julia Wellman | |
| Martin Family Stadium Renovation | College of William and Mary | Completed (07/27/10) | John Fisher | |
| Landscape Project at Mountain Empire Community College | Virginia Community College System | Completed (07/21/10) | Julia Wellman | |
| Hopewell-Prince George 230 kV Transmission Line and Prince George Substation, Dominion Virginia Power | State Corporation Commission | Completed (07/15/10) | Julia Wellman | |
| Improvements at the Back Bay National Wildlife Refuge Entrance | USDOT/Federal Highway Administration | Completed (07/15/10) | Julia Wellman | |
| Southeast High Speed Rail from Richmond, Virginia to Raleigh, North Carolina | USDOT/Federal Railroad Administration | Completed (08/30/10) | John Fisher | |
| Addendum IV of Amendment 4 to the Interstate Fisheries Management Plan for Weakfish | DOC/NOAA/National Marine Fisheries Service | Completed (06/21/10) | John Fisher | |
| Demolition of the Mason Creek Bridge (Structure LP-69) at Naval Station Norfolk | DOD/U.S. Navy | Completed (07/01/10) | John Fisher | |
| Signature Engineering Building | Virginia Tech | Completed (06/16/10) | Anne Pinion | |
| 241 and 245 Port Republic Road | James Madison University | Completed (07/01/10) | Julia Wellman | |
| Lee Street Connective Elements | University of Virginia | Completed (06/30/10) | Julia Wellman | |
| Cornerstone Apartments | U.S. Department of Housing and Urban Development | Completed (06/29/10) | Julia Wellman | |
| Shoulders Hill Complex | U.S. Department of Housing and Urban Development | Completed (06/24/10) | Julia Wellman | |
| Listing of Nine Distinct Population Segments of Loggerhead Sea Turtles as Endangered or Threatened | DOC/NOAA/National Marine Fisheries Service | Completed (06/22/10) | John Fisher | |
| Lighthouse Multi-Service Center | U.S. Department of Housing and Urban Development | Completed (05/25/10) | Anne Pinion | |
| OCS Mid-Atlantic Proposed Oil and Gas Lease Sale 220 and G&G Exploration on South and Mid-Atlantic OCS | DOI/Minerals Management Service | Review postponed indefinitely by MMS | John Fisher | |
| Replacement of the Berth 15 Area, Norfolk Naval Shipyard | DOD/U.S. Navy | Completed (06/17/10) | Anne Pinion | |
| Opening a Portion of the Georges Bank Closed Area to Surfclam and Ocean Quahog Harvesting | DOC/NOAA/National Marine Fisheries Service | Completed (06/09/10) | John Fisher | |
| LAP Operations of PGU-14 Depleted Uranium Rounds | Radford Facility Army Ammunition Plant | Completed (05/19/10) | Julia Wellman | |
| Powhatan State Park | Department of Conservation and Recreation | Completed (06/16/10) | Julia Wellman | |
| Poplar Grove National Cemetery, Rehabilitate Facilities, Resources and Character-Defining Elements to National Cemetery Standards | DOI/National Park Service | Completed (05/13/10) | John Fisher | |
| Repaving Activities and Straddle Carrier Rack Construction, Norfolk International Terminals | Virginia Port Authority | Completed (06/08/10) | Anne Pinion | |
| Lonesome Pine Airport | Federal Aviation Administration | Completed (05/19/10) | Anne Pinion | |
| Academic Services Building, Germanna Community College | Virginia Community College System | Completed (06/02/10) | Anne Pinion | |
| Installation of a New Outfall Pipe at the Joint Expeditionary Base Little Creek Fort Story West | DOD/U.S. Navy | Completed (06/07/10) | John Fisher | |
| Milking Parlor, Barn and Associated Facilities | Department of Corrections | Completed (06/09/10) | Julia Wellman | |
| On-Site Housing Construction Project, Southeastern Virginia Training Center | Department of Behavioral Health and Development Services | Completed (06/01/10) | John Fisher | |
| Briton Trace, Hampton | U.S. Department of Housing and Urban Development | Completed (06/09/10) | Julia Wellman | |
| Construction of North and South Hangars, Louisa Co. Airport | Federal Aviation Administration | Completed (05/03/10) | Anne Pinion | |
| Clean Energy Research and Design Center, Southwest Virginia Higher Education Center | University of Virginia | Completed (06/02/10) | Julia Wellman | |
| Proposed Student Center Building, Tidewater Community College, Virginia Beach Campus | Virginia Community College System | Completed (07/12/10) | Julia Wellman | |
| Construction of a Controlled Industrial Facility and Demolition of Dry Docks 6 and 7, Norfolk Naval Shipyard | DOD/U.S. Navy | Completed (06/03/10) | Anne Pinion | |
| Barry and Bill Battle Building | University of Virginia | Completed (05/13/10) | Anne Pinion | |
| Spring Arbor at River Road | U.S. Department of Housing and Urban Development | Completed (05/24/10) | John Fisher | |
| Outer Continental Shelf Oil and Gas Leasing Program for 2012-2017 | DOI/Minerals Management Service | Completed (06/30/10) | John Fisher | |
| Geological and Geophysical Exploration on the Mid- and South Atlantic Outer Continental Shelf | DOI/Minerals Management Service | Completed (05/17/10) | John Fisher | |
| Preliminary Revised 5-Year Outer Continental Shelf Oil and Gas Leasing Program for 2007-2012 | DOI/Minerals Management Service | Completed (04/29/10) | John Fisher | |
| Proposed Water Tank Construction, Greensville Correctional Center | Department of Corrections | Completed (05/19/10) | Anne Pinion | |
| Crystal City - Potomac Yard Interim Transit Improvements, WMATA | DOT/Federal Transpotation Administration | Completetd (06/03/10) | John Fisher | |
| Nationwide Ballast Water Discharge Standard | DHS/U.S. Coast Guard | Completed (05/25/10) | Julia Wellman | |
| Back Bay National Wildlife Refuge: Draft Environmental Assessment and Comprehensive Conservation Plan | U.S. Fish and Wildlife Service | Completed (04/29/10) | Julia Wellman | |
| Chiller Plant, Phase 1 | Virginia Tech | Completed (05/13/10) | Anne Pinion | |
| Entrance Road Connection to Weir Road | John Tyler Community College, Chester | Completed (05/17/10) | John Fisher | |
| Wayland Hall Renovation | James Madison University | Completed (05/13/10) | Anne Pinion | |
| Taxiway Pavement Rehabilitation, Newport News-Williamsburg Airport | DOT/Federal Aviation Administration | Completed (06/09/10) | John Fisher | |
| Expansion of a Child Development Center at Defense Supply Center, Richmond | DOD/Defense Logistics Agency | Completed (05/11/10) | John Fisher | |
| 2010-2012 Atlantic Herring Specifications | DOC/NOAA/National Marine Fisheries Service | Completed (05/05/10) | John Fisher | |
| Real Property Master Plan | DOD/U.S. Army | Completed (04/28/10) | Julia Wellman | |
| Landstown-Virginia Beach 230kV Transmission Line Rebuild | State Corporation Commission | Completed (05/14/10) | Julia Wellman | |
| The Rockefeller, Norfolk | U.S. Department of Housing and Urban Development | Completed (05/05/10) | Julia Wellman | |
| Installation of a Bulkhead at Naval Station Norfolk | DOD/U.S. Navy | Completed (05/06/10) | Anne Pinion | |
| Temporary Boat Shelter | DOD/U.S. Coast Guard | Completed (05/20/10) | John Fisher | |
| Roadway Improvements to Intersection Route 165 (Mt. Pleasant Road) and Fentress Airfield Road at Naval Auxiliary Landing Field Fentress | DOD/U.S. Navy | Completed (05/04/10) | John Fisher | |
| Driver Training Facility | Department of State Police | Completed (06/23/10) | Anne Pinion | |
| Base Realignment and Closure (BRAC) of the 192nd Fighter Wing | DOD/Air National Guard | Completed (04/05/10) | Anne Pinion | |
| Phase III Academic Building, Northern Virginia Community College, Woodbridge Campus | Virginia Community College System | Completed (09/02/10) | John Fisher | |
| Framework 21 to the Atlantic NMFS Sea Scallop Fishery Management Plan | DOC/NOAA/National Marine Fisheries Service | Completed (04/20/10) | John Fisher | |
| Alternate Energy Project at Wallops Flight Facility | National Aeronautics and Space Administration | Completed (04/28/10) | Julia Wellman | |
| Brault Building Expansion, Northern Virginia Community College | Virginia Community College System | Completed (04/20/10) | Anne Pinion | |
| 2010 Spiny Dogfish Specifications and Management Measures | DOC/NOAA/National Marine Fisheries Service | Completed (04/13/10) | John Fisher | |
| Cellular Antenna Rawland Site, Middle Peninsula Airport | Federal Aviation Administration | Completed (04/12/10) | Julia Wellman | |
| Chesterfield Airport, Telecommunications Tower | Federal Aviation Administration | Completed (05/05/10) | Julia Wellman | |
| Courthouse Lane II Apartments | U.S. Department of Agriculture | Completed (04/15/10) | John Fisher | |
| Army Lodging at Fort Lee | DOD/U.S. Army | Completed (03/24/10) | Anne Pinion | |
| Implementation of the 2005 Base Realignment and Closure Recommendations 5 and 132 at Fort Belvoir | DOD/U.S. Army | Completed (04/06/10) | Anne Pinion | |
| Airfield Lighting Rehabilitation at Newport News-Williamsburg International Airport | DOT/Federal Aviation Administration | Completed (04/14/10) | John Fisher | |
| Harbor North Apartments | U.S. Department of Agriculture | Completed (03/25/10) | John Fisher | |
| Ladysmith Southbound Rest Area Replacement | Department of Transportation | Completed (04/20/10) | John Fisher | |
| Medium Temperature Hot Water-Phase 2 | University of Virginia | Completed (04/15/10) | Anne Pinion | |
| Beach Centre | U.S. Department of Housing and Urban Development | Completed (04/01/10) | John Fisher | |
| Apartments at Hampton Roads Crossing | U.S. Department of Housing and Urban Development | Completed (04/15/10) | John Fisher | |
| West Grace Street Student Housing and Laurel Parking Deck | Virginia Commonwealth University | Completed (03/31/10) | Anne Pinion | |
| Outfall 058 Re-establish Flow | DOD/U.S. Navy | Completed (03/30/10) | John Fisher | |
| Alderman Road Housing – Phase III and Utilities | University of Virginia | Completed (04/15/10) | Julia Wellman | |
| Qualification Training Range at Fort Lee | DOD/U.S. Army | Completed (04/12/10) | Julia Wellman | |
| Shoreline Restoration and Infrastructure Protection Program | National Aeronautics and Space Administration | Completed (04/14/10) | Anne Pinion | |
| Management of 8 Excess Buildings at Naval Support Activity | DOD/U.S. Navy | Completed (03/22/10) | Anne Pinion | |
| Virginia State Law Enforcement Training Facility | Department of State Police | Completed (08/24/10) | Julia Wellman | |
| Proposed Foodbank of the Virginia Peninsula | U.S. Department of Housing and Urban Development | Completed (03/09/10) | Anne Pinion | |
| Proposed Demolition of Buildings at Saint Juliens Creek Annex | DOD/U.S. Navy | Completed (04/01/10) | Julia Wellman | |
| Atlantic Deep-Sea Red Crab Fishery Management Plan and 2010 Specifications | DOC/NOAA/National Marine Fisheries Service | Completed (02/26/10) | John Fisher | |
| South Side Depot: Boundary Adjustment Study and Environmental Assessment | National Park Service | Completed (02/18/10) | Julia Wellman | |
| Acquisition and Expansion: Phase 1 | Virginia Community College System | Completed (06/29/10) | John Fisher | |
| Renovation of Randolph Hall and Mason Hall | University of Mary Washington | Completed (03/11/10) | Julia Wellman | |
| Beth Shalom Parkside Assisted Living Facility | U.S. Department of Housing and Urban Development | Completed (03/04/10) | John Fisher | |
| Pentagon Emergency Response Center | U.S. Department of Defense | Completed (02/17/10) | John Fisher | |
| Woodglen Lake Spillway Improvement Project, Pohick Creek Watershed Dam #3 | U.S. Department of Agriculture | Completed (03/04/10) | Anne Pinion | |
| Rehabilitation of Chambers Field Stormwater Drainage System, Naval Station Norfolk | U.S. Department of the Navy | Completed (03/01/10) | Anne Pinion | |
| 230 kV Transmission Line, Loudoun and Prince William Counties | State Corporation Commission | Completed (03/11/10) | John Fisher | |
| Towne Place at Greenbrier | U.S. Department of Housing and Urban Development | Completed (03/03/10) | John Fisher | |
| Rebuild of Saltville-Kingsport 138kV Transmission Line Segment | State Corporation Commission | Completed (02/25/10) | Julia Wellman | |
| Chilled Water Central Utility Plant Addition | Christopher Newport University | Completed (02/25/10) | Julia Wellman |
* Link to project descriptions for current projects.