Mirant Potomac River Generating Station
Five Stack Permit Information
December 10, 2007
Comments received on proposed five-stack permit
November 19, 2007
October 19, 2007
Subject | Draft permit (PDF) | Public notice (PDF) | Public hearing date | Public comment period | Agency contact |
|---|---|---|---|---|---|
Mirant Potomac River Generating Station | Notice | November 19, 2007 | October 19 to | Terry Darton | |
NOTE: Due to their size, the following documents are available upon request: continuous emissions monitoring data and stack parameters used for modeling and modeling results data. Please email Monica Harvey. | |||||
October 5, 2007
There are two proposed comprehensive State Operating Permits for the Mirant Potomac River Generating Station. The first proposed permit assumes the current five-stack configuration and expands upon the June 1, 2007, permit by including all pollutants. The second proposed permit assumes the five stacks have been reconfigured into two stacks (stack merge).
A more in-depth explanation was presented at the October 10, 2007, Air Pollution Control Board meeting.